If you work with social housing repairs in Peterborough, do not treat every work order as having the same legal deadline. Awaab’s Law gives social landlords defined duties where the legal risk thresholds are met. Repair contractors need clear instructions about priority, access, safety measures and what to report back. This guide explains that distinction and provides a practical work-order checklist.
Updated 20 October 2026. England only. The landlord must assess hazards and follow the legislation; this page is not legal advice or a substitute for an assessment.
Who is responsible under Awaab’s Law?
The duties sit with social landlords such as housing associations and local authorities when acting as landlords. The landlord is responsible for investigating, communicating with tenants, arranging actions and complying with applicable deadlines. A repair contractor can carry out agreed work and provide evidence, but hiring someone does not transfer those statutory obligations to the contractor.
The Regulator of Social Housing’s Safety and Quality Standard also requires registered providers to deliver effective, efficient and timely maintenance and planned improvements. That standard covers more than just Awaab’s Law hazards.
What applies in October 2026?
Phase 1 began on 27 October 2025. It covers all emergency hazards, and significant hazards arising from damp and mould. The prescribed timescales depend on the classification of the hazard, not simply whether the job is labelled a leak or mould removal.
| Statutory issue | Main timing requirement for the social landlord |
|---|---|
| An emergency hazard within scope | Investigate and make safe within 24 hours |
| A potential significant damp or mould hazard | Investigate within 10 working days |
| Significant damp or mould hazard confirmed after investigation | Make safe within 5 working days after the investigation concludes |
| Investigation finds action is required | Provide the tenant with a written summary generally within 3 working days, subject to the exceptions in the regulations |
| Further work needed to prevent recurrence | Start the further work or arrange its commencement within 5 working days; actual work must begin within 12 weeks at the latest |
Read the exact rules and exceptions, including where suitable alternative accommodation is required, in the official Awaab’s Law Phase 1 guidance for social landlords.
The law does not mean a contractor can promise to arrive within 24 hours at every property. A landlord needs its own triage and suitable emergency arrangements, and a contractor needs to explicitly accept the deadlines in its work order.
What changes on 30 November 2026?
The government has published Phase 2 guidance for an expansion from 30 November 2026. It extends the defined significant-hazard regime to additional categories, including excess cold and heat, specified falls, electrical safety, fire and explosions, hygiene, and structural collapse or falling elements. Not every minor repair in these categories meets the legal threshold.
The full rules and hazard definitions matter. For example, fire risks in communal areas already subject to separate fire safety legislation must be handled under the correct framework rather than assuming all such risks are duplicated under Awaab’s Law.
Use the official Phase 2 guidance and its linked hazards annex when assigning priorities. Do not apply Phase 2 before its commencement.
What a social housing repair work order should tell the contractor
A vague instruction such as “mould, urgent” does not tell the attending team enough to plan safely. A better work order includes:
- The hazard classification and requested action: The landlord must determine whether this is emergency, significant or routine; the contractor needs the practical work instructed.
- Access: Who will contact the resident, preferred appointment times, safe access and whether the home is occupied.
- Immediate safety controls: Whether the landlord has already isolated unsafe services or arranged temporary measures.
- The suspected cause and prior inspection evidence: Photos and findings, with sensitive resident information shared securely.
- Trade competence: Whether a qualified electrician, Gas Safe engineer or specialist assessor is required.
- The work and timescale: What counts as “make safe”, what longer-term works are authorised and which deadlines have been agreed with the contractor.
- Variations and escalation: Who approves additional defects discovered on site, and how urgent findings are reported back immediately.
- Evidence and handover: What job notes, photographs, certificates, resident communication and completion records the landlord requires.
What if the job is bigger than the initial repair?
An initial visit may make the property safe but not remove the underlying cause. A leaking pipe might need replacing, then a damaged ceiling may need drying and repair. Visible mould may return unless the source of moisture is addressed. Keep the emergency or safety action distinct from the planned follow-on work in the scope and completion notes.
A contractor should never certify that a statutory hazard is resolved solely because cosmetic work has been done, without the appropriate assessment and evidence.
Do these deadlines apply to private landlords?
Not automatically. This article addresses the social rented sector. Private landlords have important repairing duties, but any extension of prescribed Awaab’s Law deadlines to private rented homes must be checked against the applicable legislation and commencement timetable.
For that separate topic, see our Awaab’s Law and private rentals guide.
Support for local social housing contractors and landlords
360 Maintenance Solutions Ltd welcomes enquiries from housing associations and principal contractors for scoped multi-trade repairs in Peterborough and surrounding Cambridgeshire towns. We discuss availability and reporting requirements before accepting work; we do not claim an automatic Awaab’s Law SLA.
For documented experience, see our window restrictors and plumbing work for a social housing provider in Whittlesey.
Discuss social housing maintenance and subcontracted repairs or send your work order.