Electrical & EICRReviewed by 360 Maintenance Solutions LtdPublished Last reviewed

EICR C1, C2, C3 & FI Codes Explained — Peterborough Landlord Guide

An EICR (Electrical Installation Condition Report) records the condition of a property's electrical installation. Inspectors classify observations using codes: C1, C2, C3 and FI. This guide explains what each code means, which ones make a report unsatisfactory, and what Peterborough landlords should do next.

This guide explains EICR terminology in general terms. The classification of a specific electrical installation must be determined by the competent person carrying out the inspection.

Quick answer

A C1 means danger present; a C2 means potentially dangerous; a C3 means improvement recommended; and FI means further investigation required without delay. A C1 or C2 means remedial work is required and the EICR is unsatisfactory. FI requires investigation. A C3 does not on its own make an EICR unsatisfactory. For rented properties, required work generally needs completing within 28 days, or sooner if the report specifies a shorter period.

EICR codes at a glance

CodeMeaningDoes it affect a satisfactory result?Typical next step
C1Danger present — risk of injuryYes — makes the report unsatisfactoryUrgent remedial work required
C2Potentially dangerousYes — makes the report unsatisfactoryRemedial work required
C3Improvement recommendedNo — does not on its own make the report unsatisfactoryImprovement advisable but not required under the regulations
FIFurther investigation required without delayThe report cannot be considered satisfactory until investigatedFurther investigation required

What is an EICR?

An Electrical Installation Condition Report is a formal assessment of the condition of a property's fixed electrical installation — the consumer unit, wiring, sockets, switches and accessories. For most private rental properties in England, an EICR is required at least every five years, or sooner where the report sets a shorter next-inspection date. Always follow the next-inspection date on your report.

What does C1 mean on an EICR?

A C1 means danger is present — there is a risk of injury. It is the most immediately serious classification and requires urgent remedial action. An EICR containing a C1 is unsatisfactory.

Why it matters: a C1 indicates an actual danger that should be addressed without delay, often by making the affected part safe (for example isolating a damaged accessory) before a full repair. The specific action depends on the installation and the inspector's professional assessment.

What does C2 mean on an EICR?

A C2 means a potentially dangerous condition has been identified. Remedial work is required, and an EICR containing a C2 is unsatisfactory.

What happens next: arrange for a suitably qualified electrical professional to carry out the remedial work within the required timescale. A C2 does not automatically mean the whole property needs rewiring — see below.

What does C3 mean on an EICR?

A C3 means improvement is recommended. It does not on its own make an EICR unsatisfactory and does not by itself require remedial work under the electrical safety regulations. However, the recommended improvements may still be sensible to carry out, particularly where they relate to safety or future-proofing the installation.

What does FI mean on an EICR?

FI means further investigation is required without delay. The inspector could not reach an adequate conclusion about part of the installation — for example because access or testing was limited — and needs to investigate it further. FI is not something a landlord should ignore: until the investigation is complete, that part of the installation cannot be considered satisfactory.

Which EICR codes mean the report is unsatisfactory?

A C1 or C2 makes the EICR unsatisfactory — remedial work is required. FI requires further investigation and can also mean the report cannot be considered satisfactory until that investigation is completed. A C3 alone does not make a report unsatisfactory.

Does a C2 mean the whole property needs rewiring?

No, not automatically. Remediation can range from replacing a single damaged accessory or correcting a bonding connection, through to more extensive work, depending on the actual condition and the inspector's findings. The scope of work is determined by the specific observations on the report, not by the code alone.

Does a C3 have to be repaired?

Not purely because it is a C3 under the electrical safety regulations described here. A C3 does not make a report unsatisfactory and does not by itself require remedial work. Improvements may still be advisable, and many landlords choose to act on sensible C3 observations, but they are not required remedial work in the same way as C1 or C2 findings.

What happens after C1, C2 or FI?

Required remedial or investigative work is arranged and completed within the required timescale, then appropriate written confirmation or certification is obtained. Our unsatisfactory EICR guide walks through the full process, including the documents to retain.

How long does a landlord have to carry out EICR remedial work?

Under current England regulations, required remedial or investigative work generally needs to be completed within 28 days of the report, or sooner where the report itself specifies a shorter period. Landlords should also retain the appropriate written confirmation of completed work and provide documents to the required recipients in accordance with the applicable rules. See the GOV.UK electrical safety guidance for the current detail.

Common reasons electrical issues are identified

Observations on an EICR can arise from a range of conditions. Examples include:

  • Damaged or aged accessories (sockets, switches, accessories with cracked casings).
  • Issues with protective devices (e.g. bonding or earthing concerns).
  • Inappropriate or non-compliant alterations to the installation.
  • Signs of damage, overheating or deterioration.

The classification depends on the actual installation and the inspector's professional assessment — the same condition can receive a different code depending on context.

What we see in Peterborough rental properties

We carry out EICR inspections and remedial work across Peterborough. Observations we encounter can include aged consumer units, damaged accessories and earthing or bonding matters. We describe these in general terms — every installation is assessed on its own condition.

How much do EICR remedial works cost?

EICR remedial work is quoted after inspection because the cost depends on the number and nature of observations, access, parts, any re-testing and certification, and whether circuits need further investigation. Our Prices page shows our current EICR inspection rates (from £120 + VAT for a 1–2 bed property); remedial work itself is quoted on assessment. See our EICR service page for details.

Official sources and further reading

Reviewed using official GOV.UK electrical safety guidance current on 30 September 2026. This is general information, not legal advice.

Electrical regulations can change. This guide was reviewed using official government guidance current on 30 September 2026. Always refer to your EICR and a suitably qualified electrical professional for advice relating to a specific installation.

Frequently asked questions

Is C1 worse than C2?

›

A C1 indicates danger present — a risk of injury. A C2 is potentially dangerous. Both mean the EICR is unsatisfactory and remedial work is required. A C1 is typically the more immediately serious finding and warrants urgent attention.

Can a property be rented with a C2?

›

A C2 means remedial work is required and the EICR is unsatisfactory. For a property subject to the electrical safety regulations, required remedial work generally needs to be completed within 28 days (or sooner if the report specifies). Landlords should arrange the work promptly rather than letting the property remain in an unsatisfactory state.

Does C3 fail an EICR?

›

No. A C3 means improvement is recommended, but it does not on its own make an EICR unsatisfactory and does not by itself require remedial work under the electrical safety regulations. Improvements may still be sensible.

What does FI mean?

›

FI means further investigation is required without delay. The inspector could not reach an adequate conclusion about part of the installation and needs to investigate it. It is not something to ignore.

Does a C2 mean I need a rewire?

›

No, not automatically. Remediation can range from replacing a single accessory or correcting a bonding connection to more extensive work, depending on the actual installation and the inspector's findings.

How quickly must EICR remedial work be completed?

›

Under current England regulations, required remedial or investigative work generally needs to be completed within 28 days, or sooner where the report sets a shorter deadline. Always follow the timescale on your report.

Do I need another full EICR after repairs?

›

Not necessarily a completely new full EICR. Acceptable written confirmation can include a satisfactory EICR, an Electrical Installation Certificate, a Minor Electrical Installation Works Certificate or other appropriate certification, depending on the work undertaken. Your electrical professional can advise what applies to your situation.

Who can carry out EICR remedial work?

›

Remedial work should be carried out by a suitably qualified, competent electrical professional. We can carry out remedial work after an EICR across Peterborough — see our EICR and electrician services.

Related guides

Related services

Need help with EICR remedial work in Peterborough?

We carry out EICR inspections and remedial electrical work for landlords across Peterborough. Call or WhatsApp for a fixed-price quote.

360 Maintenance Solutions Ltd — Peterborough property maintenance. Company No. 16662796. Public liability insured up to £2 million. Email contact@360fix.uk.